The documentation elaborated will include engineering plans and calculations for the integrated atmospheric ADU, the vacuum distillation unit VDU (870,000 TPA), the asphalt blowing unit BBU (250,000 TPA), and the CPU cooling and bottling unit (10 metric tons/hr). Our customer is ABC (All Bitumen Cameroon) together with EPC (Euro Petroleum Consultants) and bitumen licensor POERNER.
With our years of experience and expertise in the oil and gas industry, we will provide the client with the best output through an innovative and cost-effective solution so that the customer can immediately achieve profitability and value their capital expenditure (CAPEX). It takes us 9 - 11 months to create the preFEED documentation.